pljevlja

Environmental Impact Assessment (EIA) for the Construction of new Wastewater Treatment Plant in TPP Pljevlja (210 MW), Montenegro

PE Electric Power Industry of Montenegro strives to reduce negative impact to environment, as one of the prior requirements for undisturbed operation. On eof the measures, aimed at reduced emissions of pollutants into the recipient water streams was construction of waste water treatment plant. Implemented measures will enable TPP Pljevlja to achieve emission limit values set by national regulation.

EIA Study has analyzed all positive and negative environmental impacts expected during both construction and operation phase and has defined technical and organizational measures to be conducted in order to prevent or reduce negative impact on the environment and human health.

Services provided

  • EIA scope application to the relevant Authority
  • Environmental Impact Assessment (EIA)

Technical data

  • Capacity: 210 MWe
  • Oily wastewater treatment system
  • Coal handling wastewater treatment system
  • WTP and FGD wastewater treatment system
  • Sanitary wastewater treatment system

 

Client

Electric Power Industry of Serbia (EPS)