The Objective of This Project Is to Ensure The Reliability And Integrity Of Crude Transfer System By Replacing The Existing MOL Transfer Lines And Associated Facilities.
Front-End Engineering Design:
- New 10” Diameter Aboveground Pipeline Between KSDS And KMDS. Decommissioning/ Demolition Of Existing 12” Diameter MOL.
- New 12” Diameter Aboveground Pipeline Between FNDS And FMDS. Decommissioning/ Demolition Of Existing 10” Diameter MOL.
- New 10” Diameter Aboveground Pipeline Between FSDS And FMDS. Decommissioning/ Demolition Of Existing 12” Diameter MOL.
- Main Oil Lines Related Facilities (Pig Launcher / Receiver, Valves, Fittings, Supports And The Like)
- A New Pipeline Monitoring System/Leak Detection System (LDS) To Be Provided For The New Pipelines. LDS Nodes Shall Be Installed At KMDS And FMDS. These Nodes Will Gather Process Data From Respective Stations’ FCS/ESD And Provide Localized Leak Detection Facility. A Central System Shall Be Installed At DIC Which Collect Data From Above Mentioned Nodes And Provide Central Monitoring/Leak Detection For Complete MOL & Crude Transfer Pipeline System.
- New Field Instruments, Including F&G Detectors For Local And Remote Monitoring, Control And Safeguarding Of New Pipelines. The Instruments And Detectors Shall Be Interfaced With Respective Stations’ New FCS, ESD And F&G Systems.
- All Necessary Modifications Related To Process, Mechanical, Piping, Instrumentation, Electrical, Civil/Structural, Environmental And Loss Prevention Works.
- All Necessary Modification To The Utility Systems.
- Extending The Condensate Lines /Oily Water Lines (From Whtps And Other Plants) To Connect To Respective New MOL Pipelines From The Nearest Point After Duly Blinding The Tie-In Point At The Existing MOL Pipelines. This Includes Condensate Line From KM Old Dehydration Plant.
- A New F&G Detection System And Fire Protection System Consisting Of Fire Water System And Portable Fire Extinguishers.