The objectives of the study were to update the transmission master plan for the 400kV and 132kV electric grid in Jordan and to review the existing master plan. Several National Electric Grid expansion alternatives have been examined in order to propose the most reliable system configuration up to the year 2020 and based on transmission planning criteria and least cost strategies. The National Electric Power Company (NEPCO) team was led by the appointed power transmission experts from Energoprojekt ENTEL, jointly performing all the necessary studies and investigations including:
Services provided
Technical data
Client
National Electric Power Company (NEPCO)