Aiming to ensure reliability and integrity of crude oil transfer system, Qatar Petroleum carried out the Front End Engineering and Design (FEED) for replacement of existing MOL transfer lines from remote degassing stations to main degassing stations and associated facilities.
As a part of its Engineering Consultancy Services, Energoprojekt ENTEL prepared environmental documentation according to QP Guidelines and Qatar regulation. The scope of services included project activities’ review and identification of potential negative impacts on environment during construction and operation phase. Depending on the estimated level of environmental impact, necessary control measures were defined in order to prevent, mitigate or eliminate pollutant emission.
Services provided
Technical data
Client
Qatar Petroleum (QP)