In line with adopted development goals, PE Electric Power Industry of Serbia (EPS) intended to invest in its first renewable energy plant. The future Wind Power Plant KOSTOLAC, with rated capacity of up to 34 MW, is planned to be located in the Municipality of Kostolac, in the south-east part of the country.
Energoprojekt ENTEL provided consultancy services including development of Preliminary Design and Pre-Feasibility study. The documentation assembled provided the Client necessary information and design data for preparation of planning documents and the next phases of project documentation (investigation works, feasibility study, conceptual and detailed design etc.), equipment selection, connection to the power transmission grid and similar. The Client later decided to increase capacity to 66 MW.