In the design phase of project implementation, Energoprojekt ENTEL developed Feasibility study and Basic design for replacement of electrostatic precipitator in Unit A5 (110 MW) of TPP Kolubara B, as well as replacement of ash handling system. In the EPC stage, as a member of EPC Consortium, ENTEL was in charge of technic al and design document preparation, overall project management and
Replacement of Electrostatic Precipitator and Ash and Slag Handling System at TPP Kolubara, Unit A5, 110 MW included the following scope of works:
1. Project Management,
2. Engineering
3. Procurement of Equipment and Materials
4. Erection Works
5. Functional Testing
6. Commissioning
7. Personnel Training
8. Maintenance - Warranty Period.
The project implementation enabled efficiency of plant operation to be increased, while meeting regulatory environmental requirements associated with maximum permissible dust emission levels. The EPC project was executed by Consortium comprised of Energoprojekt ENTEL and Energoprojekt OPREMA.
Services provided
Technical data
Client
Electric Power Industry of Serbia (EPS)