Reconstruction of dust reduction equipment represents one of the measures aimed to bring down dust emissions from power units to the level below emission limits values required by regulations. In that respect, the project refers to the necessary reconstruction of electrostatic precipitators in TPP Nikola Tesla A, Unit 3 (329 MW) and TPP Morava (120 MW). With space constraints at the locations have proven to be particularly challenging to overcome, Energoprojekt ENTEL has assembled basic design and feasibility study for each of the two power units.
Services provided
Technical data
Dust concentration at the ESP outlet:
Client
Electric Power Industry of Serbia (EPS)