Reconstruction of electrostatic precipitators in TPP Nikola Tesla A,
Unit 3 (329 MW) and TPP Morava (120 MW), Serbia

Reconstruction of dust reduction equipment represents one of the measures aimed to bring down dust emissions from power units to the level below emission limits values required by regulations. In that respect, the project refers to the necessary reconstruction of electrostatic precipitators in TPP Nikola Tesla A, Unit 3 (329 MW) and TPP Morava (120 MW). With space constraints at the locations have proven to be particularly challenging to overcome, Energoprojekt ENTEL has assembled basic design and feasibility study for each of the two power units.

Services provided

  • Basic Design
  • Feasibility Study
  • Cost / Benefit Analysis
  • General Project Report
  • Fire Protection Analysis

Technical data

Dust concentration at the ESP outlet:

  • TPP Nikola Tesla A, Unit 3: 30 mg/m3
  • TPP Morava: 50 mg/m3

 

 

Client

Electric Power Industry of Serbia (EPS)