The works under the PHASE XI project include establishment of new transmission substations as well as refurbishment/ modification/ upgrade/ replacement of existing transmission substations/ underground power cables. The works are spread all over the state of Qatar including newly developed areas as well as existing areas.
The Scope of Consultancy Services includes tendering, design verification, supervision, witnessing FAT/type tests and warranty services etc. for the area/package-wise EPC works along with EPC Telecom works which is a separate package under GTC/488/2012 (Substations). The Consultancy Services are divided to two parts.
Part 1 Covers Consultancy Services related to establishment of substations, cables & all associated works of Phase XI Transmission System Network Expansion Project (Stage 1 & Addendum) which corresponds to the scope of two EPC Tenders: GTC/450/2011 - Cables (awarded to ten EPC Contractors) and GTC/488/2012 – Substations (awarded to seven EPC Contractors). Part 2 is Framework (Call off) Agreement of this Tender, which basically covers employment of the Consultant’s staff for various services as required by the Client.
Services provided
Technical data
Client
Qatar General Electricity & Water Corporation (KAHRAMAA)