Consultancy Services for Upgrading of 220/132kV Sur Grid Station, Oman

Scope of works included the following:

  • Construction of a new 220/132kV Sur Station and construction of 132kV cable link between Sur 1GS and Sur 2 G
  • Construction of new double 400kV OHL from Jahloot to Sur
  • Construction of new double 220kV OHL from Sur 2 GS to Sur PP
  • Extension of existing 132 kV SWY at existing 132/33kV Sur S/S

Services provided

  • Design Engineering Services
  • Supervision of Construction Works

Technical data

  • 400kV OHL from Jahloot to Sur: 121 km

 

Client

Oman Electricity Transmission Company (OETC)