Consultancy Services for Upgrading of 220/132kV Sur Grid Station, Oman
Scope of works included the following:
- Construction of a new 220/132kV Sur Station and construction of 132kV cable link between Sur 1GS and Sur 2 G
- Construction of new double 400kV OHL from Jahloot to Sur
- Construction of new double 220kV OHL from Sur 2 GS to Sur PP
- Extension of existing 132 kV SWY at existing 132/33kV Sur S/S