Consultancy Services for 132/11kV Substation No. 2 for “Akoya by Damac” at Al Hebiah Third, Dubailand (Mudon), Dubai

The project addresses engineering consultancy services for new 132/11kV MUDONDXB substation to provide power supply to the Phase – 2 development of Golf Community Project at Al Hebiah Third, Dubailand (Mudon) for Damac Crescent Properties LLC. The Scope of Works includes preliminary design, tender documents, tender and tender analysis, construction including defects liability period of 132/11kV MUDONDXB Substation.

 

Design, supply, installation, testing & commissioning of 132/11kV MUDONDXB Substation included:

  • Construction of new Substation buildings
  • Supply & Installation of 132kV GIS
  • Supply & Installation of 3 (Three) 50MVA, 132/11kV transformers
  • Supply & Installation of 3 (Three) 500kVA, 11/0.4kV earthing transformers
  • Supply & Installation of 11kV Switchgear
  • Supply & Installation of 6 (Six) capacitor banks
  • Supply & Installation of associated control & protection systems
  • Supply & Installation of Fire Protection, HVAC Systems, etc.

Services provided

  • Consultancy services
  • Preliminary Design
  • Tender Documents
  • Tender Analysis
  • Design review
  • Construction supervision
  • Reliability Run & Defects Liability Period Services

Technical data

  • 1 (one) 132 kV GIS
  • 3 (three) 50MVA, 132/11kV transformers
  • 3 (three) 500kVA earthing transformers
  • 1 (one) 11kV Switchgear
  • 6 (six) 11kV, 6MVAr capacitor bank
  • 132kV & 11kV interconnecting cables

 

Client

Damac Crescent Properties LLC

End User

Dubai Water & Electricity Authority