Design and Supervision Works for Water Supply Scheme to Adam,
Al Dakhiliyah Region, Oman
The project scope includes the following:
- Water Transmission Pipeline, DI pipes DN 600 mm, length app. 65 km
- Connection pipeline to Adam Airport, made of DI pipes DN 300 mm, length app. 12 km
- Distribution Network, made of HDPE pipes, DN 350, DN 200 & DN 150, total length app. 45 km
- Two concrete water reservoirs capacity of 480 m3 and 5,500 m3
- Two Tanker Filling Stations.