3

System for warning and alarming the public (PA/GA) in the area endangered by accumulations in the system of Drinsko-Limske Hydroelectric Power Plants, Serbia

In order to improve territory safety and strengthen resilience and preparedness to respond emergencies, Electric Power Industry of Serbia has decided to re-build System for Informing and Alarming the public in the area endangered by accumulations in the system of Drinsko-Limske hydroelectric power plants. New system shall consist of 38 electronic sirens capable to broadcast both alarm signals and voice announcements.

Energoprojekt ENTEL is in charge of developing design documentation (Concept and Preliminary Design – Civil Works) as well as for handling permitting process related to obtaining location conditions. "

Services provided

  • Conceptual Design
  • Preliminary Design

Technical data

  • Electronic sirens: 38
  • Sirens pole: reinforced concrete poles, 8m height

 

Client

Electric Power Industry of Serbia (EPS)