Construction Supervision Services for SCADA Project, Phase II, Oman
The project addresses Phase II of the Majan Electricity Company SCADA System Construction. Services provided in the scope of MJEC SCADA System Construction, Phase II included:
- Master System H/W and SCADA /HIS S/W for MJEC DCC (Distribution Control Center)
- Transmission Communications (FO MUX) upgrade
- Distribution communications (FO, ADSL, UHF, GPRS)
- Towers and Masts construction for UHF Radio communications
- RTU, Plant Interface, and 48V DC PSSs, for selected 15 Indoor 33 /11kV Primary S/Ss
- System Engineering, Configuring, Testing and overall DCC End-To-End Testing
- Comprehensive Training for MJEC Personnel.