The works under the PHASE 13 project include establishment of new transmission substations as well as refurbishment/ modification/ upgrade/ replacement of existing transmission substations/ underground power cables. The works are spread all over the state of Qatar including newly developed areas as well as the existing areas.
The Scope of Consultancy Services includes tendering, design verification, supervision, witnessing FAT/type tests and warranty services etc. for the area/package-wise EPC works along with EPC Telecom works which is a separate package under GTC/735/2015 (Substations). The Consultancy Services are divided in two parts.
Part 1 Covers Consultancy Services related to establishment of substations, cables & all associated works of Phase 13 Transmission System Network expansion Project which corresponds to the scope of two EPC Tenders: GTC/736/2015 - Cables (awarded to five EPC Contractors) and GTC/735/2015 – Substations (awarded to three EPC Contractors). Part 2 is Framework (Call off) Agreement of this Tender, which basically covers employment of the Consultant’s staff for various services as required by the Client.
Services provided
Technical data
Client
Qatar General Electricity & Water Corporation (KAHRAMAA)