The project scope includes detailed design and engineering services for decommissioning and demolishing of the 12'' MPPL from QP Refinery to Doha Depot and the last 13 km of 30'' pipeline from Station S to W2 to make available space at Wukair for MMUP Urban Development Project.
The scope includes complete demolition of the 12'' pipeline from downstream of an existing valve at pig/sphere launcher 3301L inside QP Refinery to Doha Depot at Abu Hamour (WOQOD) and all the facilities of pipeline system along the route. Approximately 13 km of the pipeline section near Wukair area is to be demolished and the excavated trench to be reinstated to match the surrounding land on a priority basis.
The scope also includes complete demolition of the section of 13 km pipeline. This includes the pig trap, valve station, associated above and below ground civil structures, pavements, utilities, Instruments, F&G system, FOC and equipment, in a environmentally safe way after the successful installation and commissioning of the twin 36'' pipeline.
Services provided
Technical data
• 12'' pipeline
• 13 km of 30'' pipeline
Client
Galfar Al Misnad / Qatar Petroleum (QP), Qatar