In order to comply with regulatory requirements related to the issues of environmental protection, PE District Heating Plants Belgrade have an obligation to obtain IPPC permits for their heating plants. Environmental Protection Plan represent an integral part of documentation that need to be assembled for the IPPC provision.
Environmental Protection Plan after decommissioning of Belgrade’s district heating plants have been assembled in line with BREF documents for large combustion plants which represent the reference document for plants with more than 50 MWt of installed capacity.
Environmental Protection Plans assembled defined all technical and organizational measures needed for safe plant decommissioning, according to local and European regulations regarding environmental pollution prevention.
Services provided
Environmental Protection Plan after Plant Decommissioning for Heating Plant Dunav
Environmental Protection Plan after Plant Decommissioning for Heating Plant Zemun
Environmental Protection Plan after Plant Decommissioning for Heating Plant Voždovac
Environmental Protection Plan after Plant Decommissioning for Heating Plant Miljakovac
Environmental Protection Plan after Plant Decommissioning for Heating Plant Mirijevo
Technical data
Thermal capacities:
Heating Plant Dunav 348,9 MWt
Heating Plant Zemun 50,02 MWt
Heating Plant Voždovac 232 MWt
Heating Plant Miljakovac 116,3 MWt
Heating Plant Mirijevo 116,3 MWt
Client
PE District Heating Plants of Belgrade