REFERENCE IZ OBLASTI PROIZVODNJE ENERGIJE IZ FOSILNIH GORIVA
| Project Title | Client | Country | Year of Completion |
| Consultancy Services for Construction of New Unit in TPP KOSTOLAC B, 350 MW – FIDIC Engineer, Construction Supervision, Technical control of Design for Building Permit | Electric Power Industry of Serbia – EPS | Serbia | Ongoing |
| Consultancy Services for Construction of District Heating System for supply of base heat of Belgrade (over 29 km distance, 1.000mm diameter, 600 MW capacity) and heating of Obrenovac City (200MW capacity) from TPP Nikola Tesla A – Design for Building Permit, Design for Execution, As built design | Millennium Team (Power China) | Serbia | Ongoing |
| Consultancy Services for Construction of Energy-from-Waste (EfW) Plant in Vinča, near Belgrade, with capacity of 340,000 t/year of waste (30 MWel + 56,5 MWth) – Permitting services | Beo Čista Energija | Serbia | Ongoing |
| Review and approval of the Technical Documentation for the Retrofit of the Boiler at Thermal Power Plant Pljevlja (225MW) | Electric Power Industry of Montenegro – EPCG | Monte-negro | Ongoing |
| Construction of hydrogen and hydrogen based fuels production facilities and seasonal thermal storages – Tecno economic analysis of possibilities and feasibility | Electric Power Industry of Serbia – EPS | Serbia | Ongoing |
| Consultancy Services and technical support for the Belgrade and Obrenovac District Heating supplied from TPP Nikola Tesla A | Electric Power Industry of Serbia – EPS | Serbia | Ongoing |
| Construction of FGD plant in TPP Nikola Tesla A, Units A3-A6 (4 x 350MW) – Construction Supervision + Technical Control of Design Documentation | Electric Power Industry of Serbia – EPS | Serbia | Ongoing |
| Consultancy Services for New Production Facility E (Greenfield IWPP Plant – 2400MW and 100 MIGD) – Technical, financial and legal services from tender preparation and evaluation through to financial close | Qatar General Electricity & Water Corporation – KAHRAMAA | Qatar | Ongoing |
| Construction of Backup Power Plants at Dukhan Air Base (49.5 MW + 16.5 MW standby) & North Camp Al Shamal (66 MW + 16.5 MW standby) Sites – Detail Design and Engineering Services | BHDR (QAF) |
Qatar | 2024 |
| Consultancy Services for Construction of Energy-from-Waste (EfW) Plant in Vinča, near Belgrade, with capacity of 340,000 t/year of waste (30 MWel + 56,5 MWth ) – Basic Design, Design for Building Permit, Detailed Design and As-built design preparation, Construction Supervision | Beo Čista Energija | Serbia | 2024 |
| Construction of Gas-fired Power Plants within locations of Electric Power Industry of Serbia: Analysis of Potential Locations – Consultancy Services for Technical, Market and Feasibility Considerations | Electric Power Industry of Serbia – EPS | Serbia | 2023 |
| Consultancy Services for construction of new gas-fired 200 MW CHP Pančevo (facility in the complex of Petroleum Industry of Serbia) – Preparation of Design for Building Permit, Design for Execution, As Built Design and Permitting services | Shanghai Electric Europe (GASPROM ENERGOHOLDING) |
Serbia | 2022 |
| Consultancy Services for Boiler Rehabilitation with NOx Emission Reduction at TPP Nikola Tesla B1 (650MW) – Technical control of the project (expert analysis of the thermal calculation of boiler with CFD analysis, hydrodynamic and gas-dynamic calculation, approval of Conceptual design, Preliminary design, and Design for execution) | Electric Power Industry of Serbia – EPS | Serbia | 2021 |
| Completion of Construction of TPP Kolubara B (350 MW) – Design document preparation (Conceptual Design, Basic Design and Feasibility Study, Environmental Impact Assessment Study), Bidding document preparation, selection of the preferred Bidder and Contract negotiations, Permitting Services | Electric Power Industry of Serbia – EPS | Serbia | 2021 |
| Reconstruction of Units 1 and 2 in TPP Nikola Tesla A (2×210 MW) aimed at Power Upgrade and Extension of the Units Lifetime – Feasibility Study and Basic Design | Electric Power Industry of Serbia – EPS | Serbia | 2020 |
| Reconstruction of TPP Kostolac A (100 MW + 210 MW) aimed at Power Upgrade and Extension of the Units Lifetime – Feasibility Study and Basic Design | Electric Power Industry of Serbia – EPS | Serbia | 2019 |
| Belgrade District Heating Project: heat supply from TPP Nikola Tesla A, 800 MWth – Technical and economic optimization | Electric Power Industry of Serbia – EPS | Serbia | 2018 |
| Installation of deNOx-system in TPP Nikola Tesla A, Unit 4 (329 MW) – FIDIC Engineer Role | Electric Power Industry of Serbia – EPS (KfW) | Serbia | 2018 |
| Reduction of NOx Emissions in TPP Kostolac B, 2×348,5 MW by implementation of primary reduction measures – Feasibility Study and Basic Design | Electric Power Industry of Serbia – EPS | Serbia | 2017 |
| Reduction of NOx Emissions in TPP Nikola Tesla A, Unit 6 (347,5 MW) and TPP Nikola Tesla B (2x 620 MW) by implementation of primary reduction measures – Feasibility Study and Basic Design | Electric Power Industry of Serbia – EPS | Serbia | 2017 |
| Construction of Saih aal Khairat Power Station (6×11 MW) – Design & engineering services | Rural Areas Electricity Company – RAECO | Oman | 2017 |
| Rehabilitation of TPP Kostolac B1, 350 MW and Construction of Flue Gas Desulfurization plant (the first FGD in Serbia) for Units B1 and B2 – Technical Support and Construction Supervision | Electric Power Industry of Serbia – EPS | Serbia | 2017 |
| Utilization Possibilities and Operational Future of Small TPP Units of Electric Power Industry of Serbia: TPP Nikola Tesla A1 and A2 (2×210 MW), TPP Kolubara A (3×32 MW+65 MW+110 MW), TPP Kostolac A1 & A2 (100 MW+ 210 MW) and TPP Morava (120 MW) | Electric Power Industry of Serbia – EPS | Serbia | 2016 |
| Reconstruction of TPP Nikola Tesla, Unit A4 (335,3 MW), aimed at Power Upgrade and Extension of Lifetime – Basic Design and Feasibility Study | Electric Power Industry of Serbia – EPS | Serbia | 2016 |
| Adaptation of Pneumatic Ash Removal System in TPP Kostolac B1 (348.5 MW) – Design services (process-mechanical design) | FL Smidth Hamburg GmbH (Electric Power Industry of Serbia – EPS) | Serbia | 2015 |
| Additional Capacity Implementation (ACI) as greenfield IWPP facility (2400 MW and 130 MIGD) (defining directions for the short/medium electricity/water generation system development, including term extension and water production expansion of existing plants and construction of greenfield IWPP facility) – Consultancy Services for construction | Qatar General Electricity & Water Corporation – KAHRAMAA | Qatar | 2015 |
| Reconstruction of ESP in TPP Nikola Tesla A, Unit 3 (328,4 MW) – Detailed Design | Electric Power Industry of Serbia – EPS | Serbia | 2015 |