| Project title | Client | Country | Year | Ref |
| Basic design and Feasibility Study for replacement of ash and slag removal system at TPP "Nikola Tesla A" | Electric Power Industry of Serbia. | Serbia | Ongoing | |
| Basic Design and Feasibility Study for replacement of ash and slag removal system for new deposit site at TPP "Pljevlja" 210 MW | Electric Power Industry of Montenegro | Montenegro | Ongoing | |
| Feasibility Study with Preliminary Design for reconstruction of CHP Novi Sad or construction of new CHP unit with Gas Turbine | Electric Power Industry of Serbia | Serbia | Ongoing |  |
| Participation in Project management and Design Documents preparation for replacement of Electrostatic Precipitator and ash and slag handling system at TPP Kolubara, Unit A5, 110 MW | Electric Power Industry of Serbia | Serbia | Ongoing | |
| Consultancy Services (Preliminary Design, Final Design, Tender Documents and Site Supervision) for Extension and Rehabilitation of the Water Supply & Power Generation at Masirah Wilayat (Desalination Plant 2,000 m3/day, Diesel Generators 3.1MW) | Ministry of Housing, Electricity and Water | Oman | Ongoing |  |
| Participation in preparation of Preliminary Design, Pre-Feasibility Study, Basic Design and Feasibility study for Flue Gas Desulphurization at TPP Kostolac B, 2x348,5 MW | Electric Power Industry of Serbia, Worley Parsons | Serbia | 2008 |  |
| Feasibility Analysis of rehabilitation, reconstruction or withdrawal of TPP Kolubara, Units A1 to A4 | Electric Power Industry of Serbia | Serbia | 2007 | |
| Participation in Project Management and preparation of Design documents for replacement of Electrostatic Precipitator at TPP Nikola Tesla, Unit A4, 308,5 MW | Electric Power Industry of Serbia, TPP Nikola Tesla | Serbia | 2007 | |
| Basic Design and Feasibility Study for replacement of ash and slag removal system at TPP Nikola Tesla B, 2x619 MW | Electric Power Industry of Serbia | Serbia | 2007 | |
| Consultancy Services for Preparation of Feasibility Study and Conceptual Design for Central Gas Fired Power Station in Musandam Area, Oman 6x30MW | Rural Areas Electricity Company | Oman | 2007 |  |
| Basic design and Feasibility study for replacement of ash and slag removal system at TPP Kostolac B, 2x348,5 MW | Electric Power Industry of Serbia | Serbia | 2007 | |
| Preliminary Design and Pre-Feasibility Study for replacement of ash and slag removal system for new deposit site at TPP Pljevlja, 210 MW | Electric Power Industry of Montenegro | Montenegro | 2007 | |
| Final Design of new CHP plant for supply of Clinical Center of Serbia with District Heating, Auxiliary Steam and Electricity Power Supply (3 Hot Water Boilers, 2x16,2MW and 1x0,8MW, 2 Steam boiler 8t/h and Cogeneration unit 2 MW thermal and 1,8 MW electrical energy) | World Bank,
Ministry of Health
| Serbia | 2007 | |
| Final design for refurbishment of TPP Kostolac, Unit A1, 100 MW | Electric Power Industry of Serbia | Serbia | 2006 | |
| Preliminary design and Pre-Feasibility Study for construction of TPP Nikola Tesla B, Phase II, power up to 800 MW | Electric Power Industry of Serbia | Serbia | 2006 | |
| Basic design and Feasibility Study for refurbishment or withdrawal of TPP Nikola Tesla, Units A1 & A2, 2x210 MW | Electric Power Industry of Serbia | Serbia | 2006 | |
| Basic design and Feasibility Study for refurbishment of TPP Nikola Tesla, Unit A4, 308.5MW | Electric Power Industry of Serbia | Serbia | 2006 | |
| Participation in Project Management and Design documents preparation for replacement Electrostatic Precipitator at TPP Nikola Tesla, Unit A1, 210 MW | Electric Power Industry of Serbia, TPP Nikola Tesla | Serbia | 2006 | |
| Preliminary design and Pre-Feasibility Study for replacement of ash and slag removal system at TPP Nikola Tesla A | Electric Power Industry of Serbia. | Serbia | 2006 | |
| Project Management, Final Design and Supervision for replacement of Feed Water Pumps at TPP Kolubara A, Unit 5, 110 MW | KSB Osterreich Ges.m.b.h. | Serbia | 2005 | |
| Preliminary design and Pre-Feasibility Study for replacement of ash and slag removal system at TPP Nikola Tesla B, 2x619 MW | Electric Power Industry of Serbia | Serbia | 2005 | |
| Study of energy efficiency improvement of boiler plants in thermal power plants of Electric Power Industry of Serbia | Ministry of Science and Environmental protection | Serbia | 2005 | |
| Current status analysis of the delivered equipment and works and Feasibility Study for Construction Completion of CHP Kolubara B, 2x350 MW | Electric Power Industry of Serbia, TPP Nikola Tesla, | Serbia | 2004 |  |
| Feasibility Study of Heat supply of Belgrade from Thermal Power Plants of Electric Power Industry of Serbia | The Municipality of the City of Belgrade | Serbia | 2004 |  |
| Preliminary Design and Feasibility Study for CHP Banja Luka, 165 MW | Electric Power Industry of Republika Srpska | Republika Srpska / Bosnia and Herzegovina | 2004 | |
| Feasibility study of new system for supplying of Clinical Center of Serbia with Heat, Steam and Electricity | World Bank, Ministry of Electricity | Serbia | 2003 | |
| Consultancy Services for Acquisition of Power & Desalination Plants of Kahramaa by QEWC | Lahmeyer/Qatar Electricity and Water Company | Qatar | 2001 | |
| Feasibility Study on Development of Power Generation and Desalinated Water Production for period 2001-2010 in the Governorate of Musandam | Ministry of Electricity and Water | Oman | 2000 | |
| Consultancy Services (Basic Design, Tender Documents, Civil and HVAC Final design, coordination of contractors) for Al Shemal TPP, 4x350MW, Mosul Area | Ministry of Electricity | Iraq | 2000 | |