Project title Client Country Year Ref
Consultancy Services for ADDITIONAL CAPACITY IMPLEMENTATION (ACI) 2011 - Greenfield Water and Power Plant - Facility D Kahramaa Qatar 2015 details
Feasibility Study with Basic Design of reconstruction of electrostatic precipitators for TPP Nikola Tesla A3 and TPP Morava Electric Power Industry of Serbia Serbia 2014 details
Design documents for Flue Gas Desulphurization plant construction foro TPP Nikola Tesla B, 2x620 MW, consisting of Preliminary works, Feasibility study with Basic design and Environmental Impact Assessment Study Electric Power Industry of Serbia Serbia 2013
Basic Design and Feasibility Study for replacement of ash and slag removal system for new deposit site at TPP "Pljevlja" 210 MW Electric Power Industry of Montenegro Montenegro 2013
Refurbishment of unit 2 TPP Kostolac B 348,5 MW, with the reconstruction of electrostatic precipitators, consisting of Turbine Auxiliary Plants, Boiler plant, Steam pipelines and pipelines, Electrostatic precipitator, Electric power facilities Electric Power Industry of Serbia, PD TE-KO "Kostolac" Serbia 2012
Pre-feasibility Study with Preliminary design of new unit B3 construction at location of TPP Kostolac B Electric Power Industry of Serbia Serbia 2012
"Facility D" Power and Water Plant (3000 MW+120 MIGD), power plant based on combined cycle (GT-HRSG-ST) and water plant based on five options of sea water desalination: RO, MSF, MED, Hybrid RO/MSF and Hybrid RO/MED, Preliminary Concept Design Kahramaa Qatar 2012 details
Design documents for Flue Gas Desulphurization plant construction for TPP Nikola Tesla A, Units A3-A6 Electric Power Industry of Serbia Serbia 2011
Basic design and Feasibility Study for replacement of ash and slag removal system at TPP "Nikola Tesla A" 2x210 MW Electric Power Industry of Serbia Serbia 2011
Participation in Project management and Design Documents preparation for replacement of Electrostatic Precipitator and ash and slag handling system at TPP Kolubara, Unit A5, 110 MW Electric Power Industry of Serbia Serbia 2009 details
Consultancy Services (Preliminary Design, Final Design, Tender Documents and Site Supervision) for Extension and Rehabilitation of the Water Supply & Power Generation at Masirah Wilayat (Desalination Plant 2,000 m3/day, Diesel Generators 3.1MW) Ministry of Housing, Electricity and Water Oman 2008 details
Feasibility Study with Preliminary Design for reconstruction of CHP Novi Sad or construction of new CHP unit with Gas Turbine Electric Power Industry of Serbia Serbia 2008 details
Participation in preparation of Preliminary Design, Pre-Feasibility Study, Basic Design and Feasibility study for Flue Gas Desulphurization at TPP Kostolac B, 2x348,5 MW Electric Power Industry of Serbia, Worley Parsons Serbia 2008 details
Final Design of new CHP plant for supply of Clinical Center of Serbia with District Heating, Auxiliary Steam and Electricity Power Supply (3 Hot Water Boilers, 2x16,2MW and 1x0,8MW, 2 Steam boiler 8t/h and Cogeneration unit 2 MW thermal and 1,8 MW electrical energy) World Bank, Ministry of Health Serbia 2007
Preliminary Design and Pre-Feasibility Study for replacement of ash and slag removal system for new deposit site at TPP Pljevlja, 210 MW Electric Power Industry of Montenegro Montenegro 2007
Basic design and Feasibility study for replacement of ash and slag removal system at TPP Kostolac B, 2x348,5 MW Electric Power Industry of Serbia Serbia 2007
Consultancy Services for Preparation of Feasibility Study and Conceptual Design for Central Gas Fired Power Station in Musandam Area, Oman 6x30MW Rural Areas Electricity Company Oman 2007 details
Basic Design and Feasibility Study for replacement of ash and slag removal system at TPP Nikola Tesla B, 2x619 MW Electric Power Industry of Serbia Serbia 2007
Participation in Project Management and preparation of Design documents for replacement of Electrostatic Precipitator at TPP Nikola Tesla, Unit A4, 308,5 MW Electric Power Industry of Serbia, TPP Nikola Tesla Serbia 2007 details
Feasibility Analysis of rehabilitation, reconstruction or withdrawal of TPP Kolubara, Units A1 to A4 Electric Power Industry of Serbia Serbia 2007
Preliminary design and Pre-Feasibility Study for replacement of ash and slag removal system at TPP Nikola Tesla A Electric Power Industry of Serbia. Serbia 2006
Participation in Project Management and Design documents preparation for replacement Electrostatic Precipitator at TPP Nikola Tesla, Unit A1, 210 MW Electric Power Industry of Serbia, TPP Nikola Tesla Serbia 2006 details
Basic design and Feasibility Study for refurbishment of TPP Nikola Tesla, Unit A4, 308.5MW Electric Power Industry of Serbia Serbia 2006
Basic design and Feasibility Study for refurbishment or withdrawal of TPP Nikola Tesla, Units A1 & A2, 2x210 MW Electric Power Industry of Serbia Serbia 2006
Preliminary design and Pre-Feasibility Study for construction of TPP Nikola Tesla B, Phase II, power up to 800 MW Electric Power Industry of Serbia Serbia 2006
Detail Design of New High Pressure steam Piping and associate Structural Steel Works for New Auxiliary Boiler Qatar Fertilizer Company Qatar 2006 details
Final design for refurbishment of TPP Kostolac, Unit A1, 100 MW Electric Power Industry of Serbia Serbia 2006
Study of energy efficiency improvement of boiler plants in thermal power plants of Electric Power Industry of Serbia Ministry of Science and Environmental protection Serbia 2005 details
Preliminary design and Pre-Feasibility Study for replacement of ash and slag removal system at TPP Nikola Tesla B, 2x619 MW Electric Power Industry of Serbia Serbia 2005
Project Management, Final Design and Supervision for replacement of Feed Water Pumps at TPP Kolubara A, Unit 5, 110 MW KSB Osterreich Ges.m.b.h. Serbia 2005
Feasibility Study of Heat supply of Belgrade from Thermal Power Plants of Electric Power Industry of Serbia The Municipality of the City of Belgrade Serbia 2004 details
Preliminary Design and Feasibility Study for CHP Banja Luka, 165 MW Electric Power Industry of Republika Srpska Republika Srpska / Bosnia and Herzegovina 2004 details
Current status analysis of the delivered equipment and works and Feasibility Study for Construction Completion of CHP Kolubara B, 2x350 MW Electric Power Industry of Serbia, TPP Nikola Tesla, Serbia 2004 details
Feasibility study of new system for supplying of Clinical Center of Serbia with Heat, Steam and Electricity World Bank, Ministry of Electricity Serbia 2003
Consultancy Services for Acquisition of Power & Desalination Plants of Kahramaa by QEWC Lahmeyer/Qatar Electricity and Water Company Qatar 2001 details
Consultancy Services (Basic Design, Tender Documents, Civil and HVAC Final design, coordination of contractors) for Al Shemal TPP, 4x350MW, Mosul Area Ministry of Electricity Iraq 2000
Feasibility Study on Development of Power Generation and Desalinated Water Production for period 2001-2010 in the Governorate of Musandam Ministry of Electricity and Water Oman 2000
 